Be careful to drive nails straight rather than angled.
Step by step on how to lay roof shingles.
Then work your way up to the top or center of the roof.
You want to lay the shingles from the bottom to the top of the valley.
The best advice we can give is to follow themanufacturer s instructions on the back of the package.
Repeat the process for other areas of your roof.
Then your first shingle goes on the side you are going to cut.
Afterwards secure it with nails on each corner.
When applying the new shingles each shingle course will be covered by a step flashing.
Do the same with the next shingle continuing this step until you get to the far edge of the ridge.
When you are finally ready to lay the shingles start by centering the first piece over the line markings.
See below for a shopping list tools and steps subscr.
When the felt is secured you can start laying the metal shingles.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
This video has a special meaning for me this family didn t have money to pay for a new roof and had leaks all over after removing the rock roof and fixing.
Begin this layer at the bottom of the roof and add it in horizontal rows with a slight overlap to prevent leaks.
Roof planes that butt against vertical walls at the end of the shingle course are protected by metal step flashing at least 125 mm high and 125 mm wide 5 high and 5 wide.
Weave and cut the valley on the highest side of the roof.
Cut the last ridge shingle to the length you need but be sure that no part of the roof is exposed.
Place the next shingle beside it until the first row of shingles is filled.
Again start at the bottom and nail the shingles into place.
It is important that you start out correctly.
The shingles need to be offset in every space so there are no valleys or blank spaces where a leak will start.
Metal step flashing pieces.
How to install shingles on a roof step by step.
Send us products to review or fan mail here drew s roofing and home repair 1761 e navaho rd southport nc 28.
Instead of laying down the entire layer of sheathing at once lay it gradually.
The next one goes on the low side.